Will 2027 be More of the Same for Grid Operators?

Will 2027 be More of the Same for Grid Operators?

November 23, 2026
Will 2027 be More of the Same for Grid Operators?
9:26

Key Insights

  • Grid operators enter 2027 under growing pressure as data center demand outpaces the speed of grid planning, upgrades, and new connections.
  • Power availability has become a bigger constraint for data centers than chips or talent. Delays are already affecting projects in the United States, the United Kingdom, Malaysia, and Brazil.
  • Community opposition and political scrutiny are increasing as households, local businesses, and developers feel the impact of tighter grid capacity and higher costs.
  • Grid operators need to move faster on storage, grid-enhancing technologies, and flexibility programs. Even then, many data center operators will look for their own power solutions.

Throughout 2026, there have been headlines lamenting that there isn’t enough electricity available and that the grid infrastructure is on the verge of collapse.

Electricity grids were designed for a time when electricity was one of several ways to power economies, but today we have Electric Vehicles (EVs), industrial firms decarbonizing their operations, and data centers with energy requirements that are the equivalent of towns and cities. Electricity powers modern economies but the grids were not designed for a sudden upsurge in demand.

 

More Energy Demands, More Problems

Insufficient energy supplies are being cited by data center operators as a critical risk to their entire operations—not the server racks, the chips that perform the Artificial Intelligence (AI) training and AI inference, or finding the skilled staff—but simply having enough electricity to power the operations.

Microsoft pulling out of a contract with Nscale is a case in point. The company had agreed to use Nscale’s campus near London to support its Azure services, but wasn’t prepared to wait years for grid connection upgrades to deliver the necessary power. Amazon Web Services (AWS) has experienced issues, too. Several of the company’s data centers in the United States lack sufficient power to run its newly delivered NVIDIA GB300 server racks.

The issue is not restricted to the United Kingdom and North America; authorities in Johor Malaysia are also working on reconciling the energy needs of data center operators with those of local businesses and citizens.

While Brazil is not short on overall power, the intermittent nature of renewable energy is affecting the 24/7 needs of data center operators in hubs like São Paulo. As a result, some operators and developers are now pushing to use fossil fuels, particularly natural gas, to guarantee continuous supply.

Mistakes have been made. In 2023, U.S. grid operator PJM forecast that summer peak demand levels would grow by 0.8% annually, but by 2026 that 10-year forecast had been revised upward to 3.6% annually. The earlier forecast failed to anticipate a 32 Gigawatt (GW) surge in peak demand between 2024 and 2030, nearly all of which was driven by data centers.

 

Grid Connection Delays Threaten the Next Wave of Data Center Construction

When ABI Research surveyed grid operators earlier this year, reducing queues for grid connections and a fear of outages ranked as the top concerns for Distribution System Operators (DSOs) (learn more in the report). Nobody wants a repeat of ERCOT’s experience in Texas, where a regional grid failed and the political and economic fallout continues to be felt today.

Grid operators are aware of the permit applications and know that data center construction is underway. But the two sides operate on very different investment horizons. Investments by data center operators involve permitting, construction, and installing server racks and chipsets. A new site needs to be operational inside 2 years for the operator to maintain competitiveness.

By contrast, the horizon for grid operators is 5 to 10 years or decades because expanding grid capacity is a fragmented process that requires obtaining regulatory approvals, negotiating with landowners, and conducting technical testing to ensure the grid will operate as envisioned.

 

The Politics of Power: Data Center Growth Meets Community Opposition

The U.S. midterms have brought the impact of data center construction on local communities to the fore. Dozens of municipalities have passed local bans, and several incoming governors have pledged moratoriums on new construction. Opposition stems from the premise that residents’ energy bills are rising as communities are squeezed out by data center operators. Other flashpoints include property developers unable to secure grid connections and pushback over local environmental impacts, such as the depletion of local water supplies. (For more information, refer to ABI Research’s Impact of the 2026 U.S. Midterm Elections on Data Center Build-Out presentation).

Data center construction will continue to vex politicians and governments in 2027, not only in the United States, but also in Europe, with countries like Denmark and Spain actively rewriting grid connection rules.

Governments are in a quandary. On one hand, they don’t want data centers affecting local environments or potentially causing increasing energy costs for households. On the other hand, they want data centers in their countries for reasons of data sovereignty, not wanting citizen data to be housed or accessed overseas. In addition, nobody will be happy to pay for grid upgrades through higher energy bills if they think other parties are benefiting.

 

What Grid Operators Should Do

In 2027, grid operators should accelerate investments in battery storage networks to smooth out the peaks and troughs of renewable energy supplies. Alongside storage, grid operators should prioritize investments in grid-enhancing technologies that improve the performance of existing grids. Examples include dynamic line rating software to optimize transmission levels according to local weather conditions, topology optimization to reroute power around bottlenecks, and Volt-VAR Optimization (VVO). These solutions will help maintain voltage levels and reduce electrical losses across local grid networks. ABI Research forecasts that DSOs’ spending on Grid-Enhancing Technologies (GETs) will grow at a 16% Compound Annual Growth Rate (CAGR) for the rest of the decade and reach US$544 million in 2030.

In the medium term, Transmission System Operators (TSOs) need to prioritize investments in High-Voltage Direct Current (HVDC) super-grids to move bulk renewable energy over long distances with minimal loss. DSOs should deploy smart grid management platforms to balance network loads and coordinate curtailment or flexibility programs to manage the grid load. For this to work, residential, industrial, and data center customers will need financial incentives to switch their energy use, such as the time of day they charge their EVs, when to run energy-intensive processes, and non-critical AI compute workloads.

It’s likely that these investments won’t satisfy the energy needs of data center operators. ABI Research forecasts that, in 2030, there will be almost 9,000 microgrids in North America. While not entirely for data center operators, this is an indicator that organizations will make their own arrangements to meet at least some part of their energy needs. In addition, many data center operators will opt for nuclear.

Microsoft signed a 20-year agreement with Constellation Energy in 2024 to resurrect the decommissioned Three Mile Island nuclear plant. Google and Amazon have signed agreements to fund and deploy Small Modular Reactors (SMRs) from providers like Kairos Power and X-energy to power future AI campuses. ABI Research envisions there will be 262 SMRs in operation in 2040, with data centers likely early adopters.

 

Conclusion

Enlit Europe took place in November and was a good opportunity to examine priorities in 2027. Across the exhibition floor, vendors' booths barely mentioned data centers, focusing heavily on grid resilience and stability rather than raw capacity expansion. On November 18, the European Parliament and Council reached a provisional agreement under the European grids package to slash permitting bottlenecks.

The capping authorization timelines for new grid projects include capping at 2 years and granting infrastructure to override public interest status. While grid operators have historically been constrained by conservative, risk-averse planning cultures, regulators and customers alike are expecting 2027 to mark the turning point when meaningful investments in new grid capacity will finally begin.

For more guidance on evolving grid challenges—and the opportunities for vendors—check out the following research:

 

Tags: Data Centers


Michael Larner

Written by Michael Larner

Senior Research Director
Michael Larner, Senior Research Director, leads ABI Research’s coverage of Energy and Buildings. His research examines the hardware and cutting-edge technologies utilized across the energy value chain, including energy generation, transmission, and distribution. A major current focus is grid resilience and whether electricity grids can meet the needs of residential and industrial customers, as well as the burgeoning demands of data centers. In the buildings domain, his coverage includes how building and facility managers use technologies to control and optimize heating and lighting, and secure their building estates.

FREE RESEARCH

Stay Ahead of Technology Trends With Free Research

You May Also Like

Key Insights U.S. data center growth has run into a political wall as community opposition turns permitting into the next major bottleneck. A Democratic Congress raises the pressure, but the bigger ...

Leo Gergs Leo Gergs

Key Insights: • NVIDIA’s DSX Pod addresses one of the biggest bottlenecks in AI factory deployment by turning a complex build into a pre-integrated, faster-to-deploy system. • Reference designs are ...

Leo Gergs Leo Gergs